Appendix E – Pre-Loading Plan
Pre-Loading
Plan
|
Vessel Name:
|
|
|
|
|||
|
|
|
|
|
|||
Second Officer
in charge of stability:
|
|
|
|
|
|
||
Date:
|
|
|
|
||||
|
|||||||
Fill
Sequence
|
Tank
|
Total
Capacity
|
Product
Name
|
Sounding
|
|||
Number/Name
|
@
___% Full
|
Starting
|
Planned
|
Planned
|
% Full at
|
||
|
|
Loading
|
Final
|
Final planned
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Which tanks will
have to be de-ballasted at which times of the loading sequence?
|
|
||||||
Is de-ballasting
allowed in this port?
|
Yes
|
No
|
|||||
Note: This Preloading Plan shall be maintained on board
for a period of 60 days after the date of the transfer.
|
Tidak ada komentar:
Posting Komentar