 Check before start-up:
·       Check seawater overboard valve is open
(Manual and remote control valve)
·       Temperature set point is 76 degrees or higher.
·       “Wait in stand by” is shown in the top left part of the control panel.
·       Check if none of the valves are in manual mode (as well on the control panel). Any valves in manual mode are yellow and in failure are red.

Start-up:
·       Open the manual condensate drain.
·       Press the white (start up/operation) button next too the control panel.

 During start-up:

·       When the condensate is completely drained, close the manual condensate drain.
·       If you here heavy steam banging please open de condensate drain valve again. Close the valve again if the banging stops.
·       Check if there are no leaks at pumps or valves.


·        Inform  ECR
·        Open Brine and Ejector overboard valves (manual and ABB)
·        Check if stage drain valves are closed
·        Open the seawater inlet valve on crossover
·        Open seawater suction and discharge valves of seawater pump
·        Open HT inlet and outlet valve
·        Open distilled water valve
·        Open distilled valve to tank
·        Check chemical treatment pump
·        Press auto start
·        When evaporator has started open steam valves if required
·        When on potable water:   -Check open position of valves on tanks
-Start Chlorination system

Evaporator will auto start via the following procedure
·        Seawater pump starts
·        Vacuum breaker valve closes
·        Temperature control valves starts it’s automatic control
·        Ejector pump starts
·        Feed water valve starts to control the feed pressure
·        Chemical dosing pump starts
·        Steam flash drain valve is closed
·        Steam flash pump starts
  • Brine pump and level control valve are enabled for control
  • The distilled pump and level control valve are enabled for control
  • Hot water circ pump is started
  • Steam valve starts to regulate
  • Salinometer is activated

Check operation of evaporator regularly

1 komentar:

  1. Becoming these required by doing this generally seems to get them to experience in a fashion that they need to not even bust the policies these constructed by themself. https://imgur.com/a/ivcUESY https://imgur.com/a/X4tQCea https://imgur.com/a/uqcDGeW http://mvcdlovvd4.dip.jp https://imgur.com/a/y3QWEGv http://oukspdo70r.dip.jp https://imgur.com/a/GwZu8Y7