Normal
START–UP in automatic condition
·
Turn ON the main
switch.
·
Make sure the
evaporator is selected
on AUTO (position 3).
·
Press the push button
‘AUTOMATIC START’.
·
The seawater pump
PU-SW-01 starts. (check valves)
·
The vacuum breaker
valve VA-EV-01 closes.
·
The temperature
control valve VA-SW-03 / TT-SW-01 starts it’s automatic control.
·
The ejector pump
PU-EC-01 starts.
·
The feed water valve
VA-FE-01 / PT-FE-01 starts to control the feed pressure.
·
The chemical dosing
pump is started.
·
The steam flash drain
valve VA-SF-01 is closed.
·
The steam flash pump
starts.
·
The brine pump
PU-BR-01 and level control valve VA-BR-06 are enabled for control.
·
The distillate pump
PU-DI-01 and level control valve VA-DI-01 are enabled for control.
·
The hot water pump is
started.
·
The steam valve
VA-SI-01 starts to open the steam supply to the steam booster.
·
The salinometer
switch is active.
For more information see:
Alfa Laval ‘Instruction
manual for desalination units’ – Binder 1/3
- Section
4.3 Normal start-up.