EVAPORATOR START-UP AND BTT CONTROL INSTRUCTIONS



·              Check that the overboard discharge valve has been opened. (MR/064 or MR/061)
·               Open the distillate delivery valve to technical water. (unless otherwise instructed)
·               Set the BTT (Brine Top Temperature – TICSA3°C 9) to 80.0°C.
·               Check the alarm screen for unacknowledged or active alarms.
·               Check that the Steam Booster Heater condensate drain valve is open
·               Press the ‘START-UP/OPERATION’ button.
·               The evaporator will now begin the start sequence phases.



 TICSA3°C 9 – Brine Top Temperature (BTT) Controller

80.0 = BTT Set Point (Input)
77.0 = BTT Set Point (PLC Output)
76.3BTT (Actual Temperature)

·         The operator selects the desired BTT (maximum 80°C)
·         The PLC determines the actual set point and ramps up the controller in steps of 1°C per 20 seconds



·               At the ‘Heating Phase’ the steam valve (RV3) will begin to open and heat the re-circulated HT water. The HT water valve (RV8) will remain closed on full recirculation.
·               When steam begins to appear from the Steam Booster Heater condensate drain the valve can be closed.
·               The ‘Heating Phase’ is complete when the BTT reaches 76.0°C.
·               The HT water valve (RV8) begins to open with the BTT reaches 78.0°C.
·               When the evaporator is in the ‘Start Production’ phase the BTT set point can be changed to best suit the steam plant load and the boilers can be appropriately adjusted, but no lower than 72.0°C.

1 komentar:

  1. Apabila Anda mempunyai kesulitan dalam pemakaian / penggunaan chemical , atau yang berhubungan dengan chemical,oli industri, jangan sungkan untuk menghubungi, kami akan memberikan solusi Chemical yang tepat kepada Anda,mengenai masalah yang berhubungan dengan chemical.Harga
    Terjangkau
    Cost saving
    Solusi
    Penawaran spesial
    Hemat biaya Energi dan listrik
    Mengurangi mikroba & menghilangkan lumut


    Salam,
    (Tommy.k)
    WA:081310849918
    Email: Tommy.transcal@gmail.com
    Management
    OUR SERVICE
    1.
    Coagulan, nutrisi dan bakteri
    Flokulan
    Boiler Chemical Cleaning
    Cooling tower Chemical Cleaning
    Chiller Chemical Cleaning
    AHU, Condensor Chemical Cleaning
    Chemical Maintenance
    Waste Water Treatment Plant Industrial & Domestic (WTP/WWTP/STP)
    Garment wash
    Eco Loundry
    Paper Chemical
    Textile Chemical
    Degreaser & Floor Cleaner Plant

    2.
    Oli industri
    Oli Hydrolik (penggunaan untuk segala jenis Hydrolik)
    Rust remover
    Coal & feul oil additive
    Cleaning Chemical
    Lubricant
    3.
    Other Chemical
    RO Chemical
    Hand sanitizer
    Disinfectant
    Evaporator
    Oli Grease
    Karung
    Synthetic PAO.. GENLUBRIC VG 68 C-PAO
    Zinc oxide
    Thinner
    Macam 2 lem
    Alat-alat listrik
    Packaging
    Pallet
    CAT COLD GALVANIZE COMPOUND K 404 CG
    Almunium

    BalasHapus