The FACET
bilge water separator is used to process bilge water from Intermediate bilge
water tank 15PS to Clean bilge water tank 18C or directly overboard via the
Whitebox.
In normal
operation the FACET will process from 15PS directly overboard via the Whitebox.
Before the
FACET can be started to process bilge water overboard we have to ask permission
from the on duty officer on the bridge. If we have permission from the on duty
officer on the bridge we need a starting time and a starting position to enter
in the appropriate log books.
Starting the FACET
bilge water separator
· 1. Open
the main overboard valve. (This valve is normally locked. The key is in the
ECR).
· 2. Check
if the suction valve of 15PS is open
· 3. Open
the FACET main suction valve
· 4.Open
the TOP technical water supply valve to the FACET.
· 5.Make
sure the BOTTOM technical water supply valve is closed.
· 6.Open
the technical water supply valve to the OCM
· 7.Check
if the return valve to 15PS is open(in case of high ppm/recirculation)
· 8.Check
if the Whitebox outlet valve is open
· 9.To
start the FACET select the selector switch operation mode to MANUAL
After technical water
supply solenoid valve will open to discharge any remaining oil out of the top
of the FACET. When the FACET is full of clean water it will start processing.
· 10. Check
the Whitebox is functioning properly
In order to process
water from 15PS to 18C manifold valve number ③ needs to be changed over. Instead of
going to the Whitebox water will be going to the Clean bilge water tank.
If you want to process
water from intermediate bilge water tank 15PS to Clean bilge water tank 18C no
permission from the bridge watch officer is required.
Before starting the
FACET check if the inlet valve to 18C is open
Stopping the FACET
bilge water separator
· 1.Switch
the selector switch operation mode to “0”
· 2.Close
the main suction valve leading to the Facet
· 3.Close
the technical water supply valve to the FACET
· 4.Flush
the FACET OCM for at least 30 seconds
· 5.Close
the technical water supply valve to the OCM
· 6.Close
and lock the overboard valve
· 7.Flush
the Whiteox OCM for at least 30 seconds
· 8.Report
the Whitebox data logger overboard counter to the ECR
9.When the overboard
valve is closed the bridge needs to be called for a stop time and a stop
position.
Tidak ada komentar: