“Engine starting air isolation procedure”


GENERAL
·         Ask the chief engineer for permission and inform bridge that maintenance will be carried out out ( if applicable, i.e. maintenance on propulsion equipment / stabilizers / safety and lifesaving equipment etc ).
·         Inform senior watch engineer (SWE) about all maintenance that will be performed in the engine room.
·         Follow the log/tag-out procedure as per MR600 section 5.
·         Use necessary personal protection equipment (PPE).
JOB INSTRUCTION
·         Switch engine to 1 – local.
·         Refer to drawing : main engine starting air isolation V/V’s and :
Ø  Close valve 1/3  and attach the related tag.
Ø  Close valve 2/3 and attach the related tag.
Ø  Close valve 3/3 and attach the related tag.
·         Display on ECR mimic panel “ DG ISOLATED “