Step 1:- After the EGB is drained the top
cover and the cover on the ducting before the EGB, and also the flange after
the turbo chargers can be removed.
Step 2:- Fit the plexi glass window over the
manhole on the ducting before the EGB
Step 3:- OPEN both drains on the EGB wash Tank
Step 5:- OPEN the Main Technical water valve
located fwd port side of the technical water pumps aft.
Step 7:- with one guy present at the lower
manhole to observe the level in the exhaust ducting, that it does not overflow
back to the engine, and one guy to operate the local technical water valve.
Both persons are in communication with hand held radios, the washing can begin
by opening the local tech water valve to the washing lances.
Warning
Observe the level in 11P that the tank does not overflow, and that the water
does not overflow back to the engine
Step 8:- After the washing is complete, CLOSE
all three technical water valves
Step 9:- Flush the EGB wash tank through with
technical water, after that drain the tank, Close the drains and fill the tank
back up until it is half on the sight glass.
Step 10:- Close all manhole covers and the
flange after the turbochargers
Tidak ada komentar:
Posting Komentar